EPC-W-006  PROJECT RECORD
01 · CÁS-STAIDÉAR

Residential alterations — Bray, Co. Wicklow

Report EPC-2026-3696
3D structural model of the dwelling with the walls to be demolished highlighted in red
3D MODEL VIEW · SHEET A101WALLS TO BE DEMOLISHEDSCALE 1:50

A two-storey detached dwelling, reconfigured internally to create an open-plan kitchen, dining and living space — assessed, engineered and detailed by EPC Components.

Instructed by a private client, EPC carried out a site inspection and full measured survey, reviewed the planning record, and assessed the existing structure: load-bearing cavity masonry walls carrying prefabricated timber roof trusses.

The works — removal of an internal blockwork wall and a stud partition, with existing openings infilled and tied into the retained masonry — were confirmed structurally acceptable, with load paths, temporary works, services relocation and Part F ventilation compliance all addressed in the report.

From first instruction to final report issued to the client: four weeks.

  • ClientPRIVATE RESIDENTIAL
  • LocationBRAY, CO. WICKLOW
  • StructureLOAD-BEARING MASONRY
  • ComplianceEUROCODES · BUILDING REGS
  • Programme4 WEEKS
02 · SOLÁTHAR

What was delivered

Issue sheet

One consultant. Full package.

Everything the client, contractor and certifier needed to price and build the works — from one point of contact.

The drawing set marks every element in construction language: walls to be demolished, opes to be infilled, sections through each affected wall, and a 3D model view so the client could see exactly what was proposed. The report gives the contractor demolition sequence, temporary works requirements and tie-in details for the new masonry.

  • D–01Site inspection & measured survey
  • D–02Structural Engineering Report — EPC-2026-3696
  • D–03Architectural callout sheet A101 — plans, sections & 3D views
  • D–04Demolition & ope-infill details
  • D–05Services isolation & relocation guidance
  • D–06Part F ventilation compliance advice